Tintina Mines Limited (TSXV: TTS; OTC Pink: TNNTF) reported a 460-meter copper-gold intersection from the first hole of its 2026 drilling program at the wholly owned Dos Amigos project in Chile’s Atacama Region.
Hole SDDK26-001 returned 460 meters grading 0.50% copper equivalent from 200 meters downhole to the end of the hole at 660 meters. The interval averaged 0.31% copper and 0.24 grams per tonne gold.
It included 112 meters grading 0.55% CuEq, 98 meters at 0.63% CuEq and 166 meters at 0.50% CuEq.
Mineralization Continues to End of Hole
SDDK26-001 was collared west of the interpreted contact between an earlier intrusion and the Dos Amigos quartz-diorite porphyry. The hole was drilled eastward at a dip of approximately 74 degrees.
Drilling encountered lower-grade alteration above 200 meters before entering the reported copper-gold interval. Chalcopyrite and pyrite continued through the lower portion of the hole, with mineralization associated with potassic alteration, magnetite and increased veining.
Tintina said the grades generally corresponded with the block model supporting its 2026 preliminary economic assessment. The hole also encountered approximately 0.50% CuEq near the base of the proposed pit in an area previously modeled as lower grade.
The hole was terminated shortly below the PEA pit design while still in mineralization. However, the result does not establish the depth or vertical continuity of the system. Tintina plans to deepen selected future holes to test mineralization below the current pit area.
Drilling Targets Inferred Resources
Three drill rigs are operating continuously at Dos Amigos, with Tintina preparing to add a fourth. Current drilling is focused on defining the deposit’s boundaries and testing portions of the Mineral Resource classified as Inferred.
The primary sulphide resource within the proposed open-pit area occupies a footprint measuring approximately 700 by 500 meters.
Dos Amigos contains Measured and Indicated Mineral Resources of approximately 100.8 million tonnes grading 0.35% copper and 0.28 g/t gold. Inferred Mineral Resources total approximately 256.3 million tonnes grading 0.34% copper and 0.24 g/t gold.
Tintina intends to use the new drilling to support a future resource update and planned feasibility study. One drill hole does not automatically expand the Mineral Resource or convert Inferred material into the Indicated category. Additional drilling, geological modeling and an updated estimate would be required.
CuEq Uses Higher Metal-Price Assumptions
Tintina calculated CuEq using assumed long-term prices of US$5.03 per pound for copper and US$3,570 per ounce for gold. The calculation applies metallurgical recoveries of 88.2% for copper and 64.6% for gold from the 2026 PEA.
Those metal-price assumptions are higher than the PEA’s base economic case of US$4.30 per pound copper and US$2,500 per ounce gold. The latest CuEq result therefore does not represent an update to the project’s economic analysis.
Reported intervals are downhole core lengths, and true widths have not been determined. Tintina said more drilling is required to establish the orientation and geometry of the mineralized zones.
The included intervals were calculated using a 0.20% copper cutoff and permit up to 10 meters of internal dilution.
PEA Remains Preliminary
The January 2026 PEA outlined a conceptual 35,000-tonne-per-day operation with a 26-year mine life. It estimated a pre-tax net present value of US$560 million and an after-tax NPV of US$328 million, using an 8% discount rate.
Initial capital was estimated at approximately US$1.28 billion, including a 35% contingency on plant and infrastructure costs.
The PEA is preliminary and includes Inferred Mineral Resources considered too geologically uncertain to support the economic conclusions normally applied to Mineral Reserves. Dos Amigos does not currently have a Mineral Reserve, and there is no certainty that the PEA results will be realized.
Further drilling, engineering, permitting, financing and feasibility-level work would be required before Tintina could make a construction decision.
Sources
- Tintina Mines Reports 460 Meters at 0.50% CuEq at Dos Amigos
- Tintina Mines — Dos Amigos Project
- Tintina Mines Announces Dos Amigos Preliminary Economic Assessment
- Tintina Consolidates 100% Ownership of Dos Amigos
Editorial Disclosure
This article was prepared from publicly available company disclosures. Mining Markets Report received no compensation from Tintina Mines Limited for its preparation or publication and has no disclosed business relationship with the company.
The author and publisher do not hold securities in Tintina Mines Limited. The reported assays, Mineral Resources and technical interpretations were supplied by the company and have not been independently verified by Mining Markets Report.
Reported intervals are downhole lengths, and true widths remain unknown. Copper-equivalent grades depend on company-selected metal prices and metallurgical recovery assumptions. The PEA is preliminary, includes Inferred Mineral Resources and is not supported by Mineral Reserves.
This article is for informational purposes only and does not constitute investment advice or a recommendation to buy or sell securities. Junior mining investments can be highly speculative. Readers should conduct their own due diligence and consult a qualified financial professional. Read the full Mining Markets Report disclaimer.