Arras Minerals Corp. (TSXV: ARK; OTCQB: ARRKF) reported new drill results from the Berezski Central and K-Ozek targets at its Elemes copper-gold project in northeastern Kazakhstan.
Hole EL26042 intersected 574 meters grading 0.40% copper equivalent from 98 meters downhole. The interval averaged 0.23 grams per tonne gold, 0.11% copper, 0.76 g/t silver and 38.84 parts per million molybdenum.
The results form part of Arras’s ongoing 40,000-meter diamond drilling program at Elemes.
Second Hole Returns Broad Mineralized Interval
Hole EL26041 returned 707 meters grading 0.26% CuEq from four meters downhole. It included 142 meters at 0.29% CuEq from 90 meters and a deeper 271-meter interval grading 0.31% CuEq from 492 meters.
Arras said alteration and mineralization in the two holes support its interpretation of a large porphyry copper-gold system at Berezski Central.
However, that interpretation remains preliminary. Additional drilling and geological modeling will be required to establish the system’s geometry, continuity and potential scale.
Higher-Grade Gold Intersected at K-Ozek
Separate drilling at K-Ozek returned higher-grade gold within a broader envelope of lower-grade mineralization.
Hole EL26039 intersected 22.8 meters grading 5.37 g/t gold from 124.2 meters. The interval included 13.8 meters at 8.84 g/t gold and 6.1 meters at 17.0 g/t gold.
Hole EL26029 returned 229 meters grading 0.30 g/t gold from two meters, including 25 meters at 1.11 g/t gold. Hole EL26044 intersected 40 meters grading 0.83 g/t gold, including two meters at 12.65 g/t gold.
Arras interprets K-Ozek as a structurally controlled epithermal system preserved within a down-dropped block between Berezski Central and Berezski North. The company believes another porphyry center could exist beneath it, but that concept has not been confirmed by drilling.
CuEq Figures Require Context
The reported CuEq grades use assumed prices of US$3.75 per pound for copper, US$3,000 per ounce for gold, US$35 per ounce for silver and US$30 per pound for molybdenum.
The calculations also apply assumed recoveries of 90% for copper, 85% for gold, 75% for silver and 80% for molybdenum. Actual recoveries may differ from those assumptions.
Arras’s release contains conflicting figures for a 211-meter subinterval within EL26042. The highlights report 0.62% CuEq, while the detailed geological summary reports 0.57% CuEq. The broader 574-meter interval is consistently reported at 0.40% CuEq.
All reported intervals are core lengths. True thicknesses remain unknown.
Elemes Drilling Continues
Four diamond drill rigs are operating at Elemes. Additional top-of-bedrock assay results remain pending from areas north of Berezski North and along the Aimandai Trend.
Arras said laboratory turnaround times have reached approximately 150 days because of increased sample volumes and customs and logistics issues, although the company believes the delays are gradually improving.
Elemes covers approximately 531 square kilometers in Kazakhstan’s Pavlodar Region. The release does not report a Mineral Resource or Mineral Reserve for the project. The assay results do not demonstrate that an economically viable deposit exists.
Sources
Editorial Disclosure
This article was prepared from publicly available company disclosures. Mining Markets Report received no compensation from Arras Minerals Corp. for its preparation or publication and has no disclosed business relationship with the company.
The author and publisher do not hold securities in Arras Minerals Corp. The reported assays, geological interpretations and technical assumptions were supplied by the company and have not been independently verified by Mining Markets Report.
Reported intervals are core lengths, and true thicknesses remain unknown. Copper-equivalent grades depend on company-selected metal prices and assumed recoveries. Elemes does not have a reported Mineral Resource or Mineral Reserve, and the results do not demonstrate economic viability.
Statements concerning geological continuity, additional porphyry centers, pending assays and completion of the exploration program are forward-looking and subject to geological, technical, regulatory, financing and execution risks.
This article is for informational purposes only and does not constitute investment advice or a recommendation to buy or sell securities. Junior mining investments can be highly speculative. Readers should conduct their own due diligence and consult a qualified financial professional. Read the full Mining Markets Report disclaimer.







